Dear Homeowners and Residents,
Due to the break in weather, construction crews will be installing the speed hump in the entrance lane of the Main gate starting this Friday, September 1st, and continuing thru Sunday, September 3rd. The entrance will remain open, however, all entering vehicles will be directed to cross over the new turnaround (limestone road base) in front of the guardhouse and continue to Beau Chene Drive on temporary two-way lanes on the Exit side.
Entering vehicles will only be allowed to turn right onto Beau Chene Drive. This route will not accommodate 18-wheelers or other oversized semi-trucks. The route will be marked with cones, directional signs and flagmen.
Please drive cautiously through the construction zone and be on the lookout for work crews and their equipment. Contact the BCHOA office at 985-231-6285 or via e-mail at cristinad@bchoa.org with any questions or concerns.
Cristina Donovan
CAO